This project involved the design of a pump station and ground storage reservoir for the City of Forney that included the installation of three (3) 4200 g.p.m. vertical turbine pumps and motors as well as a 4.0 million gallon prestressed concrete ground storage reservoir. Pictured here is a plan sheet prepared by Freeman-Millican as well as photographs taken during and after construction.