Water Projects
Structural Design of Barnes Bridge Pump Station
Structural calculations and modeling.
- Client: City of Mesquite, TX
- Completion Date: Under Design
- Construction Cost: $600,000
500,000 Gallon Hydropillar Facility
Approximately 180′ tall, 30′ diameter.
- Client: City of Heath, TX
- Completion Date: September 2004
- Construction Cost: $898,000
Water Transmission Line
23 miles of water transmission line.
- Client: Greater Texoma Utility Authority
- Completion Date: September 2007
- Construction Cost: $9,563,063
McKenzie Elevated Tank
3 million gallon elevated tank.
- Client: City of Mesquite, TX
- Completion Date: November 2003
- Construction Cost: $2,150,000
Bloomdale Pump Station
7.34 MGD pump station.
- Client: Greater Texoma Utility Authority
- Completion Date: December 2007
- Construction Cost: $3,254,020
Pump Station No. 2 & 4.0 MG GSR
Three 4,200 g.p.m. vertical turbine pumps.
- Client: City of Forney, TX
- Completion Date: December 2007
- Construction Cost: $4,913,587