This project involved the design of replacement pumping equipment (piping and electrical) for the City of Sherman Wastewater Treatment Plant and included the removal of three screw lift pumps, the modification of wet wells, and the installation of three submersible 110 HP Flygt sewage pumps with VFDs rated at 12,600 gpm at 26′ TDH. Pictured here is a plan sheet prepared by Freeman-Millican, a photograph taken during construction, and a photograph of the electrical controls taken at start-up.







