This project involved a new crossing of an existing creek and consisted of 950 linear feet of 27′ wide concrete pavement and 6 barrels of 10′ x 7′ box culverts spanning 40 linear feet. The construction cost was $638,387. Pictured here are a perspective drawing of the bridge prepared by Freeman-Millican, a photograph of the construction site, and a photograph of the bridge and drainage after completion.







