Drainage

Forney Eastside Drainage

Design of a drainage system to alleviate flooding problems in the original part of the city. The project included a new storm sewer system and the replacement of numerous street and driveway culverts with low-profile bridges. Completed in March 2009 with a construction cost of $3,479,919. Pictured areĀ  one of the drainage ditches prior to the completion of this project, one of the completed drainage ditches with low-profile bridge, and a map of the proposed drainage improvements.